No data-prep project before the first question.
Most search projects stall on data prep. Here, PDFs, office files and large uploads go in as they are, into one record you can ask about all at once.
Manual · Scanned PDF · Strong match
Report · Word · Strong match
Slides · Different load range
See section 12.2 for oil specifications.
Inspect journal bearings every 8,000 operating hours; reduce to 4,000 hours where sustained load exceeds 85%.
See section 12.4.
Inspection of Unit 3 for the 2026 reporting period.
Unit 3 averaged 88% sustained load over the reporting period.
See section 3 for findings.
- Understand16 terms
We kept 'journal-bearing inspection interval', 'GT-40' and '85% sustained load'.
- Route2 catalog cards
Manuals and reports in one record: scanned PDFs, Word files and slides.
- Rank4 sections
We score the bearing sections of 11 documents and put the best evidence first.
- Verify2 of 3 kept
A fixed check confirms the interval and the load figure are in the text. The service bulletin doesn’t match, so it is not used.
- Cite2 sources
You get the answer with its sources, limited to what you are allowed to see.
Technical details for administrators
The site reliability engineer, per the sign-off block.
From a mixed folder to one record you can question.
What happens to the files you bring.
Upload
Multiple formats, large files sent in parts.
One record
Everything lands in one searchable record.
Ask across it
One question searches all of it.
Cite precisely
Answers point to the exact file, section and page.
What the answer tells you about each file.
- Record sizee.g. “5,530 documents in the record”.
- File-level citationsDocument, section, page and date added.
- Any languageNon-English files are part of the same search.
- Permissions keptAnswers respect who can see which file.
Sample content · Halvorsen Energy · Engineering Archive
What journal-bearing inspection interval does the GT-40 manual set for units running above 85% sustained load?
VerifiedThe standard interval is 8,000 operating hours, reduced to 4,000 hours for units above 85% sustained load [1]. The 2026 inspection report records Unit 3 operating in that range [2].
- [1]GT-40 Operations Manual (scan) · 12.3 · p.212
Inspect journal bearings every 8,000 operating hours; reduce to 4,000 hours where sustained load exceeds 85%.
- [2]Unit 3 Inspection Report 2026 · Operating history · p.2
Unit 3 averaged 88% sustained load over the reporting period.
How it was found: Understand 16 terms · Route 2 cards → 11 docs · Rank 4 sections · Verify 2 of 3 kept · Cite 2 sources
Follow-up in Ask Assist: “Who signed the 2026 report?” The site reliability engineer, per the sign-off block. (Sign-off · p.6)
What ingestion makes possible
Questions about ingestion
Which files can we bring?
PDFs, office files and other formats, with large uploads sent in parts.
Do we need a data-preparation project first?
No. Files go in as they are, into one record you can question all at once.
How precise are the citations?
Each answer points to the exact file, section and page, with the date the file was added.
Send us one folder exactly as it is.
Scans, office files and large PDFs included. We’ll load it as it is, and you’ll ask it questions in the first meeting.