Product / Ingestion

No data-prep project before the first question.

Most search projects stall on data prep. Here, PDFs, office files and large uploads go in as they are, into one record you can ask about all at once.

Send us a folder as it is
Unnanu AI Search · Halvorsen Energy
AI Search
What journal-bearing inspection interval does the GT-40 manual set for units running above 85% sustained load?
SEARCHBrowse questions🔔 Watching
Engineering ArchiveSample content
✓ VerifiedText read from a scanQuote found in the document · checked against 2 sources
The standard interval is 8,000 operating hours, reduced to 4,000 hours for units above 85% sustained load1. The 2026 inspection report records Unit 3 operating in that range2.
1PDFGT-40 Operations Manual (scan).pdf· 12.3 · p.212
2DOCXUnit 3 Inspection Report 2026.docx· Operating history · p.2
Answered from 2 sources you can access.
Document owners
Hana Mori · Engineering Records LeadOwner of GT-40 Operations Manual (scan)
Mateo Ruiz · Site Reliability EngineerOwner of Unit 3 Inspection Report 2026
Open sourceCopy with citation☆ Watch···👍 👎
· Why this answer
Sources
▦ (3)Sort: RelevanceAll Years
PDF
GT-40 Operations Manual (scan)Answer source

Manual · Scanned PDF · Strong match

DOCX
Unit 3 Inspection Report 2026Answer source

Report · Word · Strong match

PPTX
GT-40 Service BulletinChecked · not used

Slides · Different load range

↔   ✕
PDFGT-40 Operations Manual (scan).pdf
−141%+Fit width
HEHalvorsen Energy
GT-40 Operations Manual (scan)
Sample document · p.212
12.2 Lubrication

See section 12.2 for oil specifications.

12.3 Journal bearings

Inspect journal bearings every 8,000 operating hours; reduce to 4,000 hours where sustained load exceeds 85%.

12.4 Thrust bearings

See section 12.4.

DOCXUnit 3 Inspection Report 2026.docx
−141%+Fit width
HEHalvorsen Energy
Unit 3 Inspection Report 2026
Sample document · p.2
Scope

Inspection of Unit 3 for the 2026 reporting period.

Operating history

Unit 3 averaged 88% sustained load over the reporting period.

Findings

See section 3 for findings.

How this answer was found
The five steps behind this answer, with the numbers from your search.
  1. Understand

    We kept 'journal-bearing inspection interval', 'GT-40' and '85% sustained load'.

    16 terms
  2. Route

    Manuals and reports in one record: scanned PDFs, Word files and slides.

    2 catalog cards
  3. Rank

    We score the bearing sections of 11 documents and put the best evidence first.

    4 sections
  4. Verify

    A fixed check confirms the interval and the load figure are in the text. The service bulletin doesn’t match, so it is not used.

    2 of 3 kept
  5. Cite

    You get the answer with its sources, limited to what you are allowed to see.

    2 sources
✓ Verified against 2 sources · text read from a scanned PDF
Technical details for administrators
Query terms: journal bearing · inspection · interval · gt-40 · manual · units · running · above · 85% · sustained load · operating hours · inspect · reduce · unit 3 · load · bearings
Sections ranked: 4
Documents kept: 2 of 11 routed
Assist
Asking about the 2 documents on screen
Ask anything about the documents in your results — I answer only from them.
Who signed the 2026 report?

The site reliability engineer, per the sign-off block.

Sign-off · p.6
Show evidence
👍👎
Ask for more details...
How it works

From a mixed folder to one record you can question.

What happens to the files you bring.

01

Upload

Multiple formats, large files sent in parts.

02

One record

Everything lands in one searchable record.

03

Ask across it

One question searches all of it.

04

Cite precisely

Answers point to the exact file, section and page.

On an answer from the record

What the answer tells you about each file.

  • Record sizee.g. “5,530 documents in the record”.
  • File-level citationsDocument, section, page and date added.
  • Any languageNon-English files are part of the same search.
  • Permissions keptAnswers respect who can see which file.

Sample content · Halvorsen Energy · Engineering Archive

What journal-bearing inspection interval does the GT-40 manual set for units running above 85% sustained load?

VerifiedThe standard interval is 8,000 operating hours, reduced to 4,000 hours for units above 85% sustained load [1]. The 2026 inspection report records Unit 3 operating in that range [2].

  1. [1]GT-40 Operations Manual (scan) · 12.3 · p.212Inspect journal bearings every 8,000 operating hours; reduce to 4,000 hours where sustained load exceeds 85%.
  2. [2]Unit 3 Inspection Report 2026 · Operating history · p.2Unit 3 averaged 88% sustained load over the reporting period.

How it was found: Understand 16 terms · Route 2 cards → 11 docs · Rank 4 sections · Verify 2 of 3 kept · Cite 2 sources

Follow-up in Ask Assist: “Who signed the 2026 report?” The site reliability engineer, per the sign-off block. (Sign-off · p.6)

Q&A

Questions about ingestion

Which files can we bring?

PDFs, office files and other formats, with large uploads sent in parts.

Do we need a data-preparation project first?

No. Files go in as they are, into one record you can question all at once.

How precise are the citations?

Each answer points to the exact file, section and page, with the date the file was added.

Book a demo

Send us one folder exactly as it is.

Scans, office files and large PDFs included. We’ll load it as it is, and you’ll ask it questions in the first meeting.